Shipping temporarily stopped in the Port of Antwerp
Shipping has been halted in the Port of Antwerp due to oil pollution at the Deurganck Dock.
Shipping has been halted in the Port of Antwerp due to oil pollution at the Deurganck Dock.
The High Water on the Rhine has subsided. On Thursday evening on the Upper Rhine the level at the Maxau Gauge fell below High Water Mark II (7.50 m), the level relevant for shipping. However, it is expected to rise above the Mark II level again in the coming week.
The High Water situation on the Rhine continues to improve. At present all water levels throughout the country are falling.
The High Water situation on the Rhine continues to improve today, water levels are decreasing almost everywhere.
Our offices for Contargo Waterway Logistics B.V., Contargo Road Logistics B.V., Contargo Network Service B.V., Contargo Transbox Netherlands B.V. and Contargo GmbH & Co. KG have moved from Zwijndrecht to Capelle aan de IJssel.